345 KV
- Delivery Method
- Construct Only
345 KV
必威体育官方APP下载 was selected to provide 鈥淐onstruct Only鈥� services for 76 miles of double-circuit 345kV transmission line. The scope of work 必威体育官方APP下载 is responsible for is 474 drilled pier concrete foundations ranging from 7鈥� to 12鈥� in diameter and 18鈥� to 50鈥� deep, setting 474 steel structures, and stringing the overhead wire along the route. The transmission line project starts at the Woodward EHV District Substation, 12 miles south of Woodward, Oklahoma, and runs to the Oklahoma/Kansas border about two miles southeast of Hardtner, Kansas.
This project selection was a success due largely in part to 必威体育官方APP下载鈥檚 commitment to our safety and quality culture and our state-of-the-art stringing equipment.
Construction for this project commenced in October 2013, with estimated completion in September 2014.